# NFE Checkin 8/8/2025

### Agenda 

### Action items from Last Week

- **Review cost of phase selectors and see if we can add them to phase 1.1- Dansturn**
    - to be shared.
- **Provide meter reference - Dansturn**
    - This was provided
- **Reach out to our UEDCL connections - Hillary | Dansturn | Aaron**
    - Meter paid for by Aaron. No meters currently. check meter proposed. Action item still active

### New updates

- Hopetelle meters arrived yesterday 7/8/2025 - 10 meters plus their DCU

### New Actions items

- Reach out to our UEDCL connections - **Hillary | Dansturn | Aaron**
- Review cost of phase selectors and see if we can add them to phase 1.1- **Dansturn**
- Suggestion to power the PDU with one of the existing power sources.- **Aaron**
- Get in touch with Hopetelle team about connecting meters to AMI, etc - **Aaron**
- Set up around 5 meters with a DCU as we await AMI communication - **Dansturn**
- Accountability for the money used for 3 phase extension and installation Umeme meter box, meter - **Dansturn | Aaron**