NFE Checkin 8/8/2025 Agenda  Action items  from Last Week Review cost of phase selectors and see if we can add them to phase 1.1- Dansturn to be shared. Provide meter reference - Dansturn This was provided Reach out to our UEDCL connections - Hillary | Dansturn | Aaron  Meter paid for by Aaron. No meters currently. check meter proposed. Action item still active New updates Hopetelle meters arrived yesterday 7/8/2025 - 10 meters plus their DCU New Actions items Reach out to our UEDCL connections - Hillary | Dansturn | Aaron Review cost of phase selectors and see if we can add them to phase 1.1- Dansturn   Suggestion to power the PDU with one of the existing power sources.- Aaron Get in touch with Hopetelle team about connecting meters to AMI, etc - Aaron Set up around 5 meters with a DCU as we await AMI communication - Dansturn Accountability for the money used for 3 phase extension and installation Umeme meter box, meter - Dansturn | Aaron