Tech Huddle - Behind the Meter Connection for each customer

How each customer is metered and controlled behind the bulk connection, in the Street-EMS design. Companion to the authoritative page "NFE metering strategy + Glen Street-EMS".

The question

Behind NFE's single bulk utility connection sit many single-phase tenants. "Behind the meter connection for each customer" is how we meter, bill, and control each of them individually without a separate utility meter per tenant.

Today (CHINT + Pi)

Each tenant has a CHINT DDSU666 postpaid meter on a DIN rail. A Raspberry Pi gateway polls them over Modbus RTU / RS485 and feeds OpenEMS. Billing is postpaid off the meter reads. Control (disconnect) is manual at the breaker.

Street-EMS (next generation)

One cabinet meters and controls up to 9 tenants (3 per phase) with no per-tenant meter:

Ratified: 1P (do not switch neutral except for EV), 80A rating for future EV. See the authoritative page for the full line diagram, firmware vision, and workshop context.


Revision #3
Created 2026-04-06 15:52:20 UTC by aaron.tushabe
Updated 2026-08-09 18:42:11 UTC by hillary.arinda