Sezibwa meter replacement log
Sezibwa meter replacement log
One entry per customer meter swap at Sezibwa (gateway gw-pi2). Record every system that points at a meter serial, because each one must be switched separately: the OpenEMS gateway config, the customer app (meter_sources) and the billing engine (MBE device + household link). Customers are identified here by Modbus address and serial only.
Summary
| Date | Modbus address | Old serial | New serial | Status |
|---|---|---|---|---|
| 2026-09-14 | 7 | 210302003356 | 200326020197 | All systems switched 2026-09-24; |
2026-09-14: address 7, 210302003356 to 200326020197
Why it was replaced. The old meter stopped answering on the meters bus on 2026-08-29 at 23:07 UTC (logger issue #82). It was later found physically absent. Its last register value seen on the backend was 229.35 kWh on 2026-09-04.
New meter. CHINT DDSU666 serial 200326020197, on Modbus address 7. The first backend data is from 2026-09-14; the register read 16.16 kWh on 2026-09-24.
Systems switched:
| System | Change | Date | Reference |
|---|---|---|---|
| OpenEMS gateway (gw-pi2) | New meter component meter200326020197 on unit 7 |
2026-09-14 | microgrid-gateway PR #68 |
| Customer app | meter_sources row repointed to meter200326020197/ActiveConsumptionEnergy, history start 2026-09-14; daily usage backfilled 14 to 24 Sep with the production backfill script (11 days, sums match the register) |
2026-09-24 | this page |
| Billing engine (MBE) | New device "(new meter)" added on edge sezibwa-rentals-gw-pi2 as a Consumption meter | 2026-09-24 | this page |
| Billing engine (MBE) | Household billing device changed to the new device (Change billing device); old device now unlinked; invoice meter serial field set to 200326020197 by hand | 2026-09-24 | MBE UI gap reported: serial does not follow a device change |
UnmeteredClosing gap.and opening readings (from the swap thread, Element product room, 2026-09-14). NoOld meter recorded210302003356 thisread customer244.54 betweenkWh just before removal. New meter 200326020197 read 0.31 kWh at installation (about 2026-08-3012:15 andEAT), 2026-09-13on (Modbus address 19. The old metermeter's register kept counting while it was off the bus, newso onethere notis yetno installed).unmetered gap: its closing reading covers 30 Aug to 14 Sep.
September bill. The billing engine allowstakes one billing meter per household for a wholeper period, so the September bill needsthis acustomer decision:with use aone manual reading (manualReadings in the generate call) orthat acceptjoins the gap.two meters:
| Start | End | kWh | |
|---|---|---|---|
| Old meter | 223.52 (August end, when it went silent) | 244.54 | 21.02 |
| New meter | 0.31 | reading at September close | end minus 0.31 |
| Manual reading to enter | 223.52 | 244.54 + (new end - 0.31) | sum of both |
Check first that the August bill really ended this customer at 223.52 kWh.
Watch. A stray 0.35 kWh value appears on 2026-09-14 under the old channel name. That was the new meter answering on address 7 before its component was renamed, not the old meter.