36 total results found
Battery Arbitrage Economic Case (Sezibwa)
Data provenance Underlying data: the aggregate meter meter_100 plus the 10 customer sub-meters, over 2026-03-19 to 2026-08-10, from the modbus energy-logger archive (sources: pi-direct and nextcloud-import), i.e. the pre- and early-OpenEMS period. Load basis i...
Optimal Solar and Battery Allocation (Sezibwa)
Data provenance Underlying data: the aggregate meter meter_100 plus the 10 customer sub-meters, over 2026-03-19 to 2026-08-10, from the modbus energy-logger archive (sources: pi-direct and nextcloud-import), i.e. the pre- and early-OpenEMS period. Load basis i...
Battery Price Break-Even (Sezibwa)
Data provenance Underlying data: the aggregate meter meter_100 plus the 10 customer sub-meters, over 2026-03-19 to 2026-08-10, from the modbus energy-logger archive (sources: pi-direct and nextcloud-import), i.e. the pre- and early-OpenEMS period. Load basis i...
Phase Balancing Recommendation (Sezibwa)
Recommendation for re-assigning Sezibwa's single-phase customers across the three phases of the SRNE three-phase inverter, to fix a severe load imbalance. Uses meter IDs; the site operator maps these to customers. Implementation status (2026-08-24) The two min...
OpenEMS Backend InfluxDB Data Model and Edge-ID Collision
[!warning] Verification statusThe storage-key collision vulnerability is confirmed in source code, and the repository contains a real configured collision. However, the vulnerability alone does not prove that Hillary data contaminated the current Sezibwa Pi2 ...
Sezibwa meter replacement log
Sezibwa meter replacement log One entry per customer meter swap at Sezibwa (gateway gw-pi2). Record every system that points at a meter serial, because each one must be switched separately: the OpenEMS gateway config, the customer app (meter_sources) and the b...
Solar Sizing Re-run, Sept 2026 (600 Wp panels)
This page re-runs the solar sizing from Solar Plus Battery Economic Case (Sezibwa) on three months of live OpenEMS load. It answers one question: is 7 to 8 panels (600 Wp each) still the best PV size for Sezibwa, and does it cut the energy bill in half? Answer...
Arbitrage Tracker (gw-pi2, Sezibwa)
Cumulative record of the TOU battery arbitrage on gw-pi2 (Sezibwa). Each night the inverter discharges the battery during a peak-tariff window and recharges it from the grid at the off-peak rate from 00:00. Daily progress goes to the Element business room; thi...
Arbitrage Window and Thresholds (decision record)
This page records how the nightly TOU arbitrage window and battery thresholds at Sezibwa (gw-pi2) were chosen and changed. For the running night-by-night results see the Arbitrage Tracker. The engineering record is ADR-016 in the microgrid-gateway repository. ...
NFE Daily Brief (gw-pi2, Sezibwa)
NFE daily brief Written each morning by Claude Haiku from the day's data. Newest first, last 30 days. 2026-11-27 Sezibwa Rentals battery, 27 Nov 2026 Arbitrage window: battery fell from 77.0% to 15.6%, discharging 6.76 kWh. Arbitrage gain: 652 UGX today (8.9 ...
Macro outlook: shilling, rates and NFE (15 Oct 2026)
Macro outlook: shilling, interest rates and NFE (15 Oct 2026) Asked by Aaron in the NFE leads chat. Facts are from public reporting found on 15 Oct 2026 (links at the end). Where sources disagree or I could not confirm, it is marked UNVERIFIED. NFE's own cost ...
Sezibwa solar purchase: final Muden quote (19 Oct 2026)
Sezibwa (Nansana) solar purchase: final quote, 19 Oct 2026 The final proforma invoice from Muden Systems for the 8-panel string, as sent in the "NFE Nansana panel installation" WhatsApp group on 19 Oct 2026. The PDF is attached to this page. The design is in S...
Claude Code: MCP server shows connection closed
Claude Code: MCP server shows "connection closed" Symptom At session start, Claude Code reports a local (stdio) MCP server as failed with CONNECTION_CLOSED, and its tools are missing for the whole session. Likely cause Servers launched with npx -y <package> ru...
Sezibwa Solar + Battery Operating Plan
Proven inverter behaviour: every rule on this page relies on rows of the Sezibwa SRNE proven-behaviour register (13 Nov 2026). Unproven behaviour is tested before a rule relies on it.Sezibwa Solar + Battery Operating Plan (v2, 10 Nov 2026) Goal (Hillary): get ...
NFE Debrief - 26/10/2026 (OSEAS, Open Metering)
Attendees: Hillary Arinda, Aaron Tushabe, Dansturn Kimbowa (dropped out partway: network, tired after travel). Source: Tactiq transcript (kept privately). Decisions NFE wants a paid role in the Open Metering (OMS) work, either as part of the team that builds ...
NFE call 28 Oct 2026: solar first results and trip debrief
NFE call: solar first results and Dansturn's trip, 28 Oct 2026: minutes When: Wed 28 Oct 2026, 20:58 EAT, about 60 min (called at short notice in NFE leads). Attendees: Hillary Arinda, Aaron Tushabe, Dansturn Kimbowa. Summary The first two days of Sezibwa sola...
NFE call 31 Oct 2026: arbitrage, OpenEMS and MQTT (Hillary, Dansturn)
NFE call: Hillary and Dansturn, 31 Oct 2026: minutes When: Sat 31 Oct 2026, morning (EAT), about 45 min. Aaron could not join; the planned team call (solar data and the optimiser proposal) still has to be rescheduled. Attendees: Hillary Arinda, Dansturn Kimbow...
Sezibwa SRNE inverter: proven behaviour register
Copy of the register kept in the microgrid-gateway repo: docs/sezibwa-srne-proven-behaviour.md. The repo copy is the master; this page is refreshed when it changes. Owner: Hillary (with Claude). Reviewer: Aaron. Site: Sezibwa Rentals, gateway gw-pi2. Inverte...