Advanced Search
Search Results
150 total results found
NFE checkin - June 6th 2026
Agenda Nansana phase 2 - budget review Metering 2.0 - what next Kyanja phase 1 - updates Notes and action items Review phase 2 budget with contractor after the team made adjustments - Aaron/Dansturn Kick-off Pearl Marina and Kyaliwajala - Phase...
NFE Mid week checkin - June 11th
Attendees Hillary Aaron Agenda Deploying OpenEMs Recording is here
Nansana Community Microgrid Pilot
Demonstrating Open-Source Community Energy Systems on Unreliable Grids Executive Summary Nearly Free Energy (NFE) is developing a new generation of community-owned microgrids designed for urban and peri-urban communities connected to unreliable electricity g...
Hillary / Aaron - Tech Huddle - June 29th 2026
Meeting Transcription.txt Recording here
NFE Checkin - July 4th 2026
Agenda Storage 1.0 Nansana Battery Deployment: Ready to go live, waiting for review by Dansturn Metering 2.0 OpenEMS - what is pending? Billing 2.0 MBE monthly invoices automated Ifris invoices still manual but API available: needs ...
Microgrid Cabinet Line Diagram
SRNE ASP48120SH3 (Direct Hybrid Inverter) + mbpoll Command Reference
Version: 1.1 Prepared For: Field & Deployment Teams Platform: Raspberry Pi / Linux Tool: mbpoll / pymodbus 1. Purpose Complete reference for the SRNE ASP48120SH3 three-phase hybrid inverter over Modbus RTU: what can be READ, what can be WRITTEN, and the tested...
SRNE ASP48120SH3 Modbus Register Map (validated)
Validated Modbus register map for the SRNE ASP48120SH3 three-phase hybrid inverter, verified register-by-register against the live Nansana unit, including a grid-off / grid-on transition test on 2026-07-27 that resolved the previously-unknown registers and cor...
NFE Checkin - July 25th 2026
Agenda Demos for work from this week Nansana Deployment OpenEMS development and deployment workflow Storage 2.0 changes for OpenEMS edge Fundraising efforts OSEA LF Energy Power Africa 2026 : Feedback on Glenn's line diagram Stanbic Re...
SRNE ASP48120SH3 Safe Settings Write: design, registers, and commissioning (#53)
Purpose and scope This page documents the SRNE ASP48120SH3 safe settings write feature (story #53): the ability to remotely change a bounded set of inverter parameters over Modbus, with every write guarded, verified by read back, and never retried. It records ...
NFE Checkin - August 8th 2026
Date: 8 August 2026Attendees: Aaron Tushabe, Dansturn Kimbowa, Hillary ArindaDuration: ~2 hours 5 minutes 1. Nansana Pilot & Battery Backup The Nansana battery backup system is now live and billing has proceeded without major issues. Initial operation indica...
SRNE charge/discharge scheduling registers (self-decoded, #67)
Summary We self-decoded the SRNE ASP48120SH3 settings registers (V1.7 protocol PDF + a live read-scan of the pilot inverter, firmware v925, 2026-08-09). The key result: time-of-use charge/discharge scheduling is implemented and writable, even though real-time ...
NFE metering strategy + Glen Street-EMS
Authoritative page for NFE's role in the IEEE Smart Village meshEMS / Street-EMS initiative. Compiled 2026-08-10 from the Element room "Smart Village Energy Interest Group" (full history back to 2026-04-24), the ISV Dev Kit BOM sheet, isv.wiki, and the Rev B/...
Metering protocols: DLMS/COSEM, OBIS, Modbus, MQTT (and NFE CHINT register map)
Traceable explainer: how metering data actually moves, where DLMS/COSEM, OBIS, Modbus, MQTT and HTTP each sit, and how NFE's live CHINT registers map to the OBIS standard vocabulary. Compiled 2026-08-10. Companion to "NFE metering strategy + Glen Street-EMS"....
Inverter-monitor notifications: hardening + tuning (ADR-012)
How the NFE inverter-monitor decides what to alert on, and the 2026-08-10 hardening pass that killed the nightly "Battery low" noise and closed several alert-integrity gaps. Source of truth is the code + ADR-012 in nfe-modbus-energy-logger; this is the team-f...
SRNE TOU arbitrage: plan (#67)
The plan to turn on time-of-use battery arbitrage on the Sezibwa/Nansana SRNE inverter (logger issue #67): charge the battery from the grid off-peak, discharge it to the load at peak, using the SRNE charge/discharge SCHEDULE registers written through the guar...
SRNE phase balancing: big consumers on one phase trip the inverter on battery
Problem When the site runs on battery (grid outage, typically evening or night), switching on a large single-phase load such as a heater or fan trips the inverter off until the load is removed. This causes an outage for the whole site. Evidence (2026-08-11) Pe...
Solar Plus Battery Economic Case (Sezibwa)
Data provenance Underlying data: the aggregate meter meter_100 plus the 10 customer sub-meters, over 2026-03-19 to 2026-08-10, from the modbus energy-logger archive (sources: pi-direct and nextcloud-import), i.e. the pre- and early-OpenEMS period. Load basis i...