NFE Checkin 8/8/2025

Agenda 

Action items  from Last Week

  • Review cost of phase selectors and see if we can add them to phase 1.1- Dansturn 
    • to be shared.
  • Provide meter reference - Dansturn 
    • This was provided
  • Reach out to our UEDCL connections - Hillary | Dansturn | Aaron 
    •  Meter paid for by Aaron. No meters currently. check meter proposed. Action item still active

New updates

  • Hopetelle meters arrived yesterday 7/8/2025 - 10 meters plus their DCU

New Actions items

  • Reach out to our UEDCL connections - Hillary | Dansturn | Aaron
  • Review cost of phase selectors and see if we can add them to phase 1.1- Dansturn 
  • Suggestion to power the PDU with one of the existing power sources.- Aaron
  • Get in touch with Hopetelle team about connecting meters to AMI, etc - Aaron
  • Set up around 5 meters with a DCU as we await AMI communication - Dansturn
  • Accountability for the money used for 3 phase extension and installation Umeme meter box, meter - Dansturn | Aaron