Tech Huddle - Behind the Meter Connection for each customer
How each customer is metered and controlled behind the bulk connection, in the Street-EMS design. Companion to the authoritative page "NFE metering strategy + Glen Street-EMS".
The question
Behind NFE's single bulk utility connection sit many single-phase tenants. "Behind the meter connection for each customer" is how we meter, bill, and control each of them individually without a separate utility meter per tenant.
Today (CHINT + Pi)
Each tenant has a CHINT DDSU666 postpaid meter on a DIN rail. A Raspberry Pi gateway polls them over Modbus RTU / RS485 and feeds OpenEMS. Billing is postpaid off the meter reads. Control (disconnect) is manual at the breaker.
Street-EMS (next generation)
One cabinet meters and controls up to 9 tenants (3 per phase) with no per-tenant meter:
- Metering: 3 stacked CircuitSetup 6-channel CT boards on the EMS controller give 18 CT channels: one per tenant (9), one per phase mains (3), and 6 spare. Each tenant's usage is a dedicated CT (no separate meter box).
- Control: each tenant runs through a contactor (K1..K9) whose coil is driven by an opto-isolated SSR from the EMS. That is the per-customer remote connect/disconnect used for prepaid enforcement and protection trips.
- Safety: three Ivy residual-current monitors (one per phase) give continuous leakage and neutral-imbalance insight across all tenants on that phase.
- Per-tenant policy: the EMS holds a JSON "mode" per tenant (prepaid expiry, over V/I/kW/kWh, over-generation/storage), and can warn (RGBW LED or e-paper, flash cadence) before a graceful cutoff, optionally leaving a small post-sunset lighting allowance from battery.
Ratified: 1P (do not switch neutral except for EV), 80A rating for future EV. See the authoritative page for the full line diagram, firmware vision, and workshop context.
No comments to display
No comments to display